![]() |
|
END ITEM INFORMATION - PRO SYSTEM 3000 |
||
|
Nomenclature |
PRO Unit 3000 (Portable Reverse Osmosis Unit) |
|
|
Part# |
PRO Unit 3000 LX |
|
|
NSN# |
N/A |
|
|
GSA# |
N/A |
|
|
Unit Price |
Inquire |
|
|
Shipping Cost (if not included in unit price) |
FOB Allentown PA |
|
|
External Supplements Required for Operation |
JP-8 jet Fuel/Diesel Fuel/Motor Oil/ Water source. |
|
|
Connections & Interfaces |
Uses all quick release cam-lok (1 1/2" & 1" & 3/4") and high pressure quick connect couplings (3/4"). Readily interfaces with any standard military 1 1/2" or 2" hoses for transferring potable water to other water storage bladders. |
|
|
Special Tools Required |
A. No special tools required while in operation. B. Maintenance requirements include standard metric and English wrenches, hex wrenches, adjustable wrenches, screw drivers, channel locks. Standard tool set. |
|
|
Calibration Requirements |
pH, TDS, conductivity, flow meters, etc. and all testing equipment require weekly checking and regular maintenance. |
|
|
Routine Maintenance Schedule |
1A. Oil in diesel engines needs to be checked every day before operating. 1B. Break in period, change oil after 20 hr. then oil in Yanmar diesels should be changed every 100 hr. of operation. See attached maintenance schedule. C. Backflushing multimedia filter; pre-filter and view-flow screen cleaning at least once every 20 hr. Total system flush after before each period of extended shutdown or storage. |
|
|
Routine Maintenance Parts and Costs |
See attached schedule |
|
|
Routine Maintenance Labor and Costs |
See attached schedule |
|
|
Consumables and Rate of Consumption (batteries, fuels, lubricants, etc. Not part of routine maintenance or external supplement) |
See attached schedule |
|
|
Physical Dimensions -Operational Configuration |
Shipping Dimensions: 72"L x 48"W x 53"H Weight: 1,180 lbs. Accessory Box: 44"L x 34"W x 35"H Weight: 240 lbs. |
|
|
Restrictions on Operation |
Keep from freezing and away from open flame. Do not exceed 100 PSI. Exception: High pressure pump and RO elements not to exceed 1000 PSI. |
|
|
Physical Dimensions - Storage & Transport Configuration |
See attached schedule |
|
|
Restrictions on Storage |
PRO System must be flushed with clean water and drained of excess water before putting the unit in storage. Storage temperature range -20°F to 160°F |
|
|
Decontamination Procedure |
Components may be decontaminated with soap and water or 5% hypochlorite solution. |
|
|
Average Life Expectancy |
Engines: 6,000 hr. before overhaul - Pumps: 3,000 hr. then change internals - RO Elements: 2 years |
|
|
Disposal Procedure |
||
|
Warranty & Coverage |
A full warranty will be provided covering all and any defective part and all associated repair costs, including shipping and labor, for 1 year after the date of purchase within CONUS. |
|
|
Contractor Lifecycle Support (repair, replacement, technical assistance) |
All parts and labor required for successful repair or replacement will be made available by the contractor for a period of 5 years after the date of purchase. Technical assistance will be provided by a designated company representative and through the company's 24 hour toll-free help line. |
|
|
Operation and Maintenance Training Concept |
The contractor will provide an instructor, classroom, and all necessary equipment for a 1 day training session for up to 10 personnel on use and maintenance at contractors facility at no charge. On site training anywhere in CONUS will be billed @ $500.00 per day plus expenses. |
|
|
Manuals & Videos |
The contractor will provide technical manuals and training videos necessary for operation and maintenance at no charge. |
|
|
Item Testing & Certification |
N/A |
|
|
Company Point of Contact |
Primo L. Acernese - PHN 610.821.7003 FAX 610.821.7025 |
|
|
Note: prices and specifications subject to change without notice |
||
![]() |