![]() |
|
END ITEM INFORMATION - RECOR® REACTOR PAK |
||
|
Nomenclature |
RECOR® REACTOR PAK |
|
|
Part# |
807 Alpha |
|
|
NSN# |
N/A |
|
|
GSA# |
N/A |
|
|
Unit Price |
Inquire |
|
|
Shipping Cost (if not included in unit price) |
FOB, Allentown PA |
|
|
External Supplements Required for Operation |
10 to 200 gpm @ 40 to 90 psi water supply. Standard Military cam-lok 2" inlet and 2" outlet hose. |
|
|
Connections & Interfaces |
Standard 2" military cam-lok (quick release) male and and female inlet and outlet hoses and connections. |
|
|
Special Tools Required |
NONE (9/16 wrench) |
|
|
Calibration Requirements |
NONE (pH adjustment to between 5 - 8 if needed) |
|
|
Routine Maintenance Schedule |
NONE |
|
|
Routine Maintenance Parts and Costs |
NONE |
|
|
Routine Maintenance Labor and Costs |
NONE |
|
|
Consumables and Rate of Consumption (batteries, fuels, lubricants, etc. Not part of routine maintenance or external supplement) |
New pre- and post filter elements, o-rings and o-lube. Review for replacement (if needed) every 6 to 12 months. |
|
|
Physical Dimensions -Operational Configuration |
Length: 74 in, width: 18 in, height: 34, weight: 190 lbs, |
|
|
Restrictions on Operation |
Keep from freezing and keep away from open flame. Do not exceed 150 psi. Maintain pH of water @ between 5 and 8 |
|
|
Physical Dimensions - Storage & Transport Configuration |
Length: 80 in, width: 24 in., height: 44 in., weight: 300 lbs, |
|
|
Restrictions on Storage |
Must be drained of excess water and capped to prevent air flow through unit and dry out. Storage temperature range -35C to 120C. Cannot be stacked. |
|
|
Decontamination Procedure |
Components may be decontaminated with soap and water or 5% hypochlorite solution. |
|
|
Average Life Expectancy |
RECOR® REACTORS - Trinity 239 Electro-Catalytic Reactors - 1.5 M Gallons @ 2 ppm of CL2 ; 50 gpm @ 60 psi. Housing and Frame Indefinitely. |
|
|
Disposal Procedure |
Ship spent REACTOR tubes to Manufacturer for reconditioning or recycling. |
|
|
Warranty & Coverage |
A full warranty will be provided covering all and any defective part and all associated repair costs, including shipping and labor, for 1 year after the date of purchase. |
|
|
Contractor Lifecycle Support (repair, replacement, technical assistance) |
All parts and labor required for successful repair or replacement will be made available by the contractor for a period of 5 years after the date of purchase. Technical assistance will be provided by a designated company representative and through the company's 24 hour toll-free help line. |
|
|
Operation and Maintenance Training Concept |
The contractor will provide an instructor, classroom, and all necessary equipment for a 1 day training session for up to 10 personnel on use and maintenance at contractors facility at no charge. On site training anywhere in CONUS will be billed @ $500.00 per day plus expenses. |
|
|
Manuals & Videos |
The contractor will provide technical manuals and training videos necessary for operation and maintenance at no charge. |
|
|
Item Testing & Certification |
N/A |
|
|
Contact |
Primo L. Acernese - PHN 610.821.7003 FAX 610.821.7025 | |
|
|
||
![]() |